Total Number of Approvals
Completed
1
Pending
1
Rejected
2
Pending Approvals
A1LAS2-04 High Priority
Submitted 2 days ago by Engineer Ridwan Bankole
Root Cause Analysis • Inspection Report • Remedy Design
A1LAS2-05 High Priority
Submitted 2 days ago by Engineer Ridwan Bankole
Root Cause Analysis • Inspection Report • Remedy Design
A1LAS2-08 High Priority
Submitted 2 days ago by Engineer Ridwan Bankole
Root Cause Analysis • Inspection Report • Remedy Design